Survey before concept design
Record the building, defects, alterations, materials and services before deciding what to remove or add.
Water first
Roof drainage, gutters, damp, ground moisture and airwells can affect every finish that follows.
Use compatible materials
Historic brick, lime, timber and terracotta behave differently from sealed modern systems.
Build the right team
The scope may call for a conservation architect, engineer, surveyor, contractor and authority consultation—not one general quotation.
